Inspection Framework

Glass Petri Dish Quality Control

A practical inspection process for dimensions, cover fit, visible glass quality, edge condition and packaging before shipment.

Pre-Shipment Review

Inspection points that can be seen or measured

Quality requirements should be translated into an agreed specification and sampling plan. The checks below describe the review framework, not a claim that unverified test reports or certifications exist.

01

Dimensions

Bottom diameter, cover diameter and the height of both components.

02

Cover Fit

Matching of the cover to the intended bottom across the sampled order.

03

Visible Quality

Clarity, bubbles, streaks and other visible conditions against agreed criteria.

04

Edges & Base

Edge finish, obvious chips or cracks and dish stability on a flat surface.

05

Cleanliness

Visible cleanliness and contamination risk appropriate to non-sterile supply.

06

Quantity

Sets per inner pack and carton checked against packing documents.

07

Packaging

Separation, cushioning, carton condition, labeling and closure.

08

Order Match

Final review against size, material, packaging and mark requirements.

Buyer-Supplied Criteria

Add your acceptance points before ordering

If your quality system requires a dimensional tolerance, material document, sample size, label format or packaging test, state it during RFQ. Requirements introduced after production may not be feasible.

  • Product drawing or dimensional tolerance
  • Incoming-inspection method
  • Required sampling plan
  • Material documentation request
  • Carton marks and packaging acceptance
  • Reference sample or approved photo